With everyone on a single team, the project can move forward quickly without many of the usual snags related to paperwork and contracts. Unlike design-bid-build, which requires time dedicated to the bidding process, design-build moves straight from the single-contract design phase to the construction phase. That open communication and additional pre-planning also manifests in faster project completion. With everyone working together to create the design and settle on a maximum budget, the better communication means the project often runs more smoothly during the construction phase as well. With the design-build model, the owner, engineer, and architect collaborate from the beginning of the project-sometimes even the design-builder is on board before the project begins and is also involved in that design process.